UC Berkeley Hildebrand Hall
HVAC Modernization
Six story laboratory building at UC Berkeley. The renovation project includes the conversion of the building's existing HVAC system from constant volume to variable air volume. Alter Consulting Engineers served as mechanical and controls engineer of record for the renovation project. The mechanical scope of work included design, specifications, and documentation for the conversion of the laboratory building's existing HVAC system from constant volume to variable air volume. This included adding venturi supply and exhaust valves, as well as converting the existing constant volume fume hoods to variable air volume hoods. The controls renovation included the conversion of the building's decentralized control system to the campus standardized central ALC control system. The renovation project is expected to reduce the buildings annual energy use by as much as 25%.
More Projects
Campbell Library
Grant Funding Unlocks Full Electrification for Community Library
Santa Cruz Downtown Library Mixed Use
A Library That Breathes: High-Performance Systems for a Civic Hub
Laney College Theater Modernization
From Pneumatic to High-Performance: A Theater's Energy Transformation
LBNL B84 Electrification
Concept Design for Air-to-Water Heat Pump Plant to Resolve Flue Gas Entrainment
Regency Ballroom
A 1908 Air System, Rebuilt for a 1,300 People Crowd
Laney College Library and Learning Resource Center
Claremont Middle School Multi-Purpose Building & Kitchen
Radiant Floors and Fresh Air Define This All-Electric School Building
Willard Club House
Net-Zero Public Building for Berkeley




