LBNL Building 84 Electrification
Persistent entrainment of combustion exhaust at LBNL’s Building 84 resulted in a desire to electrify building 84's HVAC and Plumbing systems.
Alter compiled a team of design professionals and issued a report summarizing the evaluation of (qty.3) potential site locations for a new electric air-to-water heat pump plant.
The report included electrical, mechanical, plumbing, civil, structural, and cost analysis of each option.
ROLE
Project Prime Mechanical Engineer Plumbing Engineer Energy Modeling Controls Engineer
OWNER
LBNL (UC Berkeley)
BUILDING SQUARE FOOTAGE
41,000 SQFT
TARGET EXISTING BUILDING EUI REDUCTION
40%
PHOTO CREDIT
Alter Engineers