Laney College Library and Learning Resource Center
From Constant Volume to VAV: Cutting a Five-Story Library's Energy Use by 25%
This is a renovation project for the five-story, 88,000 SQFT library at Laney College. Alter Engineers is the mechanical, plumbing, and controls engineer of record. The project includes a complete replacement of the building's mechanical, plumbing, and controls systems, with a goal of reducing the building's energy use intensity (EUI) by 25%. The new design replaces the existing constant air volume (CAV) system with a variable air volume (VAV) system and substitutes the old boiler and chiller with a new high-efficiency heat recovery chiller.
More Projects
Campbell Library
Grant Funding Unlocks Full Electrification for Community Library
Santa Cruz Downtown Library Mixed Use
A Library That Breathes: High-Performance Systems for a Civic Hub
Laney College Theater Modernization
From Pneumatic to High-Performance: A Theater's Energy Transformation
LBNL B84 Electrification
Concept Design for Air-to-Water Heat Pump Plant to Resolve Flue Gas Entrainment
Regency Ballroom
A 1908 Air System, Rebuilt for a 1,300 People Crowd
Claremont Middle School Multi-Purpose Building & Kitchen
Radiant Floors and Fresh Air Define This All-Electric School Building
UC Berkeley Hildebrand Hall
HVAC Modernization
Willard Club House
Net-Zero Public Building for Berkeley
